HFWP80

Before starting, check whether the fuel tank is sufficient, and there is no oil leakage at the oil pipes and joints; whether the water in the cooling system is sufficient, clean and free of leakage, and whether the fan belt is properly tightened. Check that the internal combustion engine and the generator drive part should be connected reliably, the wires of the output circuit should be well insulated, and all instruments should be complete and effective.

< 1 > 跳转到

Contact us

Telephone:+86-023-61167199

E-Mail:2102299107@qq.com

Address: Sanjiao Town, Yongchuan District, Chongqing (Sanjiao Industrial Park, Yongchuan High-tech Zone, Chongqing)

QR code

QR code

营业执照

Page Copyright Chongqing Haofa Machinery Manufacturing Co., Ltd.  Powered By: www.300.cn SEOtag